Location: pilot uranium production by in-situ leaching at the Kharasan-2 Mine, Productive Solution Processing Workshop, Zhanakorgan District, Kyzylorda Region.
The installation consists of the following equipment:
1. Arkal 2" Dual Filter manual 2-inch disc filter;
Capacity per unit — 25 m³/h;
Filtration rating — 130 microns;
Quantity — 27 units;
2. Arkal Super Angle 4" manual 4-inch disc filter;
Capacity per unit — 60 m³/h;
Filtration rating — 130 microns;
Quantity — 4 units.
3. Arkal Super Angle 4" manual 4-inch disc filter;
Capacity per unit — 40 m³/h;
Filtration rating — 55 microns.